Data Resources LLC

High-Availability Solutions

Industrial-Grade Mining Software Solutions for Mongolia

Architecting and deploying offline-first, high-availability Enterprise Asset Management (EAM) and Fleet Management Systems (FMS) for the world's most demanding environments.

Industrial control room dashboard showing mining operation monitoring systems

Engineered for the Field

Our solutions are built to withstand deep-pit constraints and limited connectivity, ensuring your data flows even when the network doesn't. We bridge the gap between heavy machinery and digital intelligence.

Offline-First Design

Synchronize mission-critical data automatically once telemetry is restored.

Greasy-Finger UX

High-contrast, large-target interfaces designed for field tablets and gloved use.

Voice-to-Text

Hands-free data entry for mechanics during maintenance cycles.

Edge Computing

Local processing power for sub-millisecond response times in the pit.

Heavy duty excavator working in a deep open-pit mine

Our Software Framework

A modular architecture built for resilience, accuracy, and predictive intelligence.

Abstract digital data points connecting into a grid pattern

The Ledger

Immutable ground-truth data logs ensuring absolute compliance and auditing across all operational shifts.

Close up of high speed server rack cooling system lights

The Engine

Automated workflows and intelligent task routing that optimizes fleet efficiency and reduces idle time.

Abstract 3D sphere representing data processing and prediction

The Oracle

Predictive insights and advanced analytics for preventive maintenance, reducing catastrophic failure risks.

Field Ready Architecture

Remote Implementation Capabilities

We specialize in the technical heavy-lifting required for remote Mongolian sites. From Ulaanbaatar to the deep Gobi, we ensure infrastructure stability.

  • Bare-Metal & VM DeploymentRobust server setups built for extreme temperature variances and dust protection.
  • VLAN & Network SegmentationSecuring operational technology (OT) from corporate networks via complex VLAN configs.
  • C4M, R4M, H4M StackCustom integration of mining-specific protocols for real-time asset tracking.
# Initializing Remote Deployment v4.2
$ connect --site "Gobi South" --vlan 40
Success: Secure tunnel established via local edge server
$ deploy --core "EAM-Ledger" --type "bare-metal"
[..........] 45% VM Container Sync
[...............] 82% Network Calibration
Node Active: Ready for 90-day pilot sync.
Field Results

Case Studies / Transformation

Three operations. Measurable outcomes in under 90 days.

Darkhan Region, Mongolia

Erdene Mongol

Gold & Copper Exploration → Fleet Intelligence

24 haul trucks · 8 drill rigs
MetricBeforeAfter / Delta
Unplanned Downtime12.1 days / mo
3.2 days / mo−73%
Overall Equipment Effectiveness51%
72%+41%
Time to Positive ROI
58 days

Key result: 73% reduction in unplanned downtime

South Gobi, Mongolia

Oyu Tolgoi

Multi-Pit Open-Cast → Real-Time Dispatch

180+ vehicles · 3 active pits
MetricBeforeAfter / Delta
Shovel-Truck Idle Time18%
6%−67%
Material Moved Per ShiftBaseline
+28%+28%
Near-Miss Safety IncidentsHigh frequency
Reduced−34%

Key result: +28% material moved per shift

Ömnögovi Province, Mongolia

Gobi Minerals

Remote Coal Site → Satellite-Synced Edge

62 vehicles · 340 km from nearest city
MetricBeforeAfter / Delta
Fuel ConsumptionBaseline
−22%−22%
Manual Report Entries / Day4+ hours
0 min−100%
Data Latency to HQMonthly batch
< 90 secReal-time

Key result: 22% fuel savings · zero manual entry

Risk-Free Evaluation

The 90-Day Optimization Pilot

We don't sell software; we deliver measurable uptime. Our 90-day pilot proves value through initial data optimization and field testing before you commit to full SaaS integration.

Phase 01

Audit & Edge Install

Baseline data collection and local hardware configuration.

Phase 02

Workflow Sync

Deploying automated routing and mechanic field tablets.

Phase 03

ROI Review

Comparison of baseline vs pilot performance metrics.

Request Your Pilot Setup

Connect with Technical Services

Ready to modernize your mining operations? Our technical lead is ready to discuss site-specific requirements.

HQ Office

Sukhbaatar District, 1st Khoroo, Ulaanbaatar, Mongolia

Direct Email

technical.services@dataresources.mn

Monochrome street map view of downtown Ulaanbaatar showing office location